Tuesday, May 5, 2020

Project Management for Airport Systems Planning- myassignmenthelp

Questions 1.Is the decision to build a new airport at Denver strategically a sound decision?Give reasons and justify your answer 2.Why did United Airlines decide to act as the project manager for the baggagehandling system on Concourse B? Give reasons and justify your answer Answers: 1. Yes, the decision to build the airport at Denver strategically a sound decision. The reason behind such is that Denvers former airport was undergoing a rapid development before the deregulations (Keller et al. 2015). The deregulation refers to the competition among open market that could bring the access to air traveling within the reach of common people, hence maximizing the air traffic at that airport. With the same, the local council of government anticipated that the Stapleton airport will unable to manage the required traffic by 2000. The airport could have been updated by giving it a sublet of life for the next coming 5 years, yet the remote place of Denver meant that the potential issue would still linger and has the potential to cause the Denver city to lose its important business. Furthermore, the Stapleton airport was one among the important connecting airports (DAndrea 2013). It was also ranked among the top eleven worst air traffic congestions in the United States. Such congestions at the Denver airport influenced the other airports as well, as it used to have only two runways which were situated very close to each other that in bad weather were regarded to be one (De Neufville 2016). The newly build airport was designated to resolve these congestion problems for the city. The earlier Stapleton airport was highly influenced by the winds of inflated velocity and this has created in the operations being transfered to the other directions (Wesley et al. 2013). This procedure has wasted about forty five minutes. The new airport on the other hand would bring this wasted time to four minutes and this in turn will save both the time and cost for the very airport. The new airport covers a total land area of about 140 km2. It is to be the largest airports in the United States in current days and has the potential to handle about 50m of passengers every year. 2. The united Airlines decided to act as the project manager for the baggage handling system for many reasons. Airports are mainly judged by the travelers or passangers depending on their capability to manage and handle the baggage systems. The mechanized baggage handling system is at the heart of the Denver airports (Schmitt and Gollnick 2016). Hence, the automated baggage handling system of the DIA or the Denver International Airport was a great initiative. It is unique within its complexity and anticipated capacity. At the same time it is a novel technology (Rebentisch 2017). It connects the gates in the three entrances or concourses where the baggages are loaded on and off the airplane along with two major terminals where the travelers claim and check their baggage. It is designed in a way to deliver every bag, including the transfers, independently from the unloading or the check-ins of the aircraft to the outward baggage reclaim. Despite the main importance of automated baggage system, the design of the system was greatly an afterthought. Like the one United Airlines operated in the city of San Francisco, the airline, during its initial planning stages, stood firm on the automated baggage system. The airline did not wanted to work on the traditional system of baggage as it was very labor intensive as well as time consuming. The officials of Denver thereby decided to design the automated baggage handling system at the Denver International Airport, as speed in handling of baggage is important in order to achieve the acceptable transfer and boarding times at the Denver (Hughes 2013). The changes in the United Airlines were the more important one. It has broaden the concourse B by eight feet in order to lodge the two moving walkways in every direction. It has added a 2nd level of the baggage service. It also had a roof designed in order to supply clearstory of the natural light. Moreover, most importantly, the United Airlines wanted a DCV (Destination Coded Vehicle) baggage handling system as in this system; the luggage could be shifted in between the gates within less than just ten minutes of time period, thereby supporting the short turnaround times (Laplante 2013). This handling system (DCV) was to be on the Concourse B only. The Denver International airport, after few cogitation came to the conclusion that all of the concourses at the airport will work on this high speed automated baggage handling system, rather than bounding it only to the United Airlines, References D'Andrea, F.D., 2013.Taking back the tarmac: Re-use of airport infrastructure. University of Cincinnati. De Neufville, R., 2016. Airport systems planning and design.Air Transport Management: An International Perspective, p.61. Hughes, P., 2013. Project Delivery Methodologies.Advice from Those Whove Been There, Done That, p.77. Keller, T.L., Trier, S.B., Hall, W.D., Sharman, R.D., Xu, M. and Liu, Y., 2015. Lee waves associated with a commercial jetliner accident at Denver International Airport.Journal of Applied Meteorology and Climatology,54(7), pp.1373-1392. Laplante, P.A., 2013.Requirements engineering for software and systems. CRC Press. Rebentisch, E., 2017.Integrating Program Management and Systems Engineering: Methods, Tools, and Organizational Systems for Improving Performance. John Wiley Sons. Schmitt, D. and Gollnick, V., 2016. Airport and Infrastructure. InAir Transport System(pp. 225-269). Springer, Vienna. WESLEY, D.A., POULOS, G., SNOOK, J., KENNEDY, P., MEYERS, M. and BYRD, G., 2013. Extreme Snowfall Variations and Cold-Air Damming in the Front Range Heavy Snowstorm of 17-19 March 2003.Journal of Operational Meteorology,1(4).

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.